Hanyang Digi Tech Factory
Company: Hanyang Digi Tech Factory
Project: UPS, Generator & Mold TR
Date: 201906
Hình ảnh dự án
Company: Hanyang Digi Tech Factory
Project: UPS, Generator & Mold TR
Date: 201906
Hình ảnh dự án
Company: Hanyang Digi Tech Factory
Project: UPS, Generator & Mold TR
Date: 201906
UPS 1500kW, 1set / 500kW, 3sets
- Power wave 33
- Battery backup time 5 minutes full load pf 0.9
Generator 1250kVA, 4 sets Standby
- Engine: Cummins /
- US, Alternator: Stamford
- UK; Control: Deepsea 8610/ UK
Cast Resin Transformer MOLD TR
3P, 1500kVA 0.4/0.22kV, 1set
LV SWGR ACB 2500A, ACB 4000A Switchgear